Licensed structural design and full design-build construction in Siaton, 95 km by road from our Bais City base. Below: the local ground and hazard facts we check before designing here.
We haven't built inside Siaton itself yet. Our completed work in the province is in Tanjay City, Canlaon City and Manjuyod — same seismic zone, same team.
Full design-build: NSCP 2015 structural design, CHB walls and RC columns, and site supervision through to the roof deck and wraparound porch.
Compact 210 sqm commercial structure designed for efficiency — safe, code-compliant, and commercially ready.
On site now (September 2026): a pickleball court build in Manjuyod, with footings and column pedestals complete, and electrical preventive maintenance plus drainage works for a restaurant in Dumaguete City.
Siaton is flagged by MGB for flood and landslide risk, so check the lot's flood history and drainage before setting floor levels.
Checked against official sources on 23 September 2026. Road distance and drive time are computed with OSRM on OpenStreetMap data (no traffic); fault distances are our own measurement on the PHIVOLCS fault map. To see the hazards under your own lot, use our lot hazard check guide.
In Siaton we offer design-build (design, permits and construction under one contract), structural design sealed by a PRC-licensed civil engineer, structural assessment of existing buildings, and renovation. Permit plans are filed with the Office of the Building Official at Siaton municipal hall. Our nearest work to Siaton is in Dumaguete City, where we are on site now with electrical maintenance and drainage works for a restaurant. More about AEDO →
Beyond Siaton, we take on projects throughout the surrounding towns of Negros Oriental — same licensed engineers, same NSCP 2015 compliance.
Does AEDO build in Siaton?
Yes. Siaton is in Negros Oriental, the one province where we do full design-build construction. It is about 95 km by road from our Bais City base, roughly 85 minutes' drive without traffic.
Has AEDO completed a project in Siaton?
Not in Siaton itself yet. Our completed projects in the province are in Tanjay City, Canlaon City and Manjuyod, and we have a build on site in Manjuyod now.
What should I check about the ground in Siaton before building?
Siaton is flagged by MGB for flood and landslide risk, so check the lot's flood history and drainage before setting floor levels. Our lot hazard check guide shows how to look up your own lot on the government hazard maps.
Who issues building permits in Siaton?
Building permits are issued by the Office of the Building Official at Siaton municipal hall. We prepare the permit set — architectural, structural, electrical and plumbing plans — sealed by licensed professionals, and coordinate the submission. See our building permit guide.
Tell us about your project — we'll respond within 24 hours with a clear plan and honest estimate.