Renovation & Extension

Renovate or extend
without guessing if it's still sound.

Every renovation or extension starts with a structural assessment of what's already there — not a guess. Then one licensed team designs, permits, and builds the addition to integrate safely with your existing structure.

Message us on Viber
NSCP·15
Design code
0k
Assessment from
0
Report turnaround
1
Team, start to finish
The difference

Why renovation starts with an assessment, not a design

Skipping straight to design is how renovations end up with cracked walls, sagging additions, or a permit rejection. Checking the existing structure first is what prevents that.

Design-first renovation

Nobody checked the existing structure

  • Unknown whether the foundation can carry a new floor or extension
  • Load-bearing walls removed without checking what they were carrying
  • Permit rejected after design is already paid for
AEDO — Assessment-First

You know what you're working with, first

  • Licensed engineer confirms what the existing structure can safely carry
  • Design integrates the new work with the structure that's already there
  • Permit-ready drawings prepared with the assessment already in hand
How it works

From assessment to turnover

1
Structural assessment
2
Design
3
Permits
4
Construction
5
Turnover

1. Structural assessment

A licensed engineer visits your site and evaluates whether the existing structure can safely support your planned renovation or extension. ₱5,000 flat, written report within 5 business days.

Scope

What's included

Structural assessment

Site visit and written report on what your existing structure can safely carry.

Extension & addition design

New structural work designed to integrate safely with what's already built.

BOQ & cost estimate

Itemized budgeting so you know the real cost before committing.

Permit documentation

Sealed, permit-ready drawings for building-permit submission.

Construction & turnover

Managed build with progress updates, then a documented handover.

NSCP 2015 compliance

Every addition checked against current seismic & wind load requirements.

Track record

A real extension project

This service line is newer than our structural design and design-build work, and we're building the project list as we go — here's a real one already completed.

Two Storey Residential Building Extension — BF Homes, Paranaque 3
Structural Design & Construction Mngt

Two Storey Residential Extension

BF Homes, ParanaqueView project →

See all 15+ projects on the main portfolio.

Questions

Frequently asked

If you're adding a floor, an extension, or removing/altering load-bearing walls, yes — an assessment confirms your existing foundation and structure can safely carry the new load before any design work starts.
Yes. Most renovation and extension clients come to us with a structure someone else built. We assess the existing structure first, then design the addition to integrate safely with it.
Design-build starts from an empty lot. Renovation and extension work starts with an existing structure, so the process always begins with a structural assessment of what's already there.
Structural additions, extensions, and most renovations that change the building's footprint or structure require a permit. We prepare sealed, permit-ready drawings as part of the design phase.
₱5,000 flat, with a licensed-engineer site visit and a written report within 5 business days.

Planning a renovation or extension? Start with the assessment.

₱5,000 flat — a licensed engineer visits your site and tells you, in writing, what your existing structure can safely carry.

Existing home being extended with new CHB block walls and scaffolding

Renovating or adding on? Let's make it safe.

Tell us about your project — we'll start with a structural assessment.

One Accountable TeamDesign, engineering, and construction under one roof.
PRC-Licensed EngineersEngineered for safety and code compliance.
Replies Within 24 HoursA real engineer reviews every message.

Tell us about your project

We'll review and reply by email — usually within 24 hours.