Five building systems.
One engineering team.
Aircon and ventilation, power, water, fire protection, drainage — designed together so they fit together. Permit-ready MEPFS plans nationwide; installation, testing & commissioning, and preventive maintenance contracts in Negros Oriental — handled by PRC-licensed engineers, including a DOLE-Accredited Professional Electrical Engineer (PEE).
Why MEPFS fails when it's five separate subcontractors
Most building-services problems aren't bad equipment — they're systems designed in isolation, colliding above the ceiling. The duct route blocks the sprinkler main, the panel is undersized for the kitchen equipment, the drainage slope was never coordinated with the beams.
Nobody owns the whole system
- Ducts, pipes and cable trays clash on site — resolved by whoever installs last
- Electrical load and aircon tonnage estimated separately, then mismatched
- Five contractors pointing at each other when something fails after turnover
Coordinated on paper, before anything is installed
- All five systems routed together on one coordinated plan set
- Loads, fixture counts and equipment sized from the same calculations
- One team accountable from permit drawings to commissioning to maintenance
From load calculations to commissioning
1. Scope & assessment
Tell us the building type, floor area and which systems you need. For existing buildings, we survey the as-built MEPFS first and report what can be reused versus replaced.
Four ways to engage us
Design & permit documents
Signed & sealed MEPFS plans with load and fixture calculations, permit-ready. Available nationwide.
Supply & installation
Roughing-in, equipment, ductwork, fire lines, testing & commissioning — in Negros Oriental.
Preventive maintenance (PMS)
Aircon, ventilation, pumps, panels and fire systems on a fixed servicing schedule — including the annual electrical safety inspection DOLE requires of establishments — certified by our DOLE-Accredited PEE.
As-built & retrofit assessment
Survey of an existing building's systems with a written deficiency report — before you renovate.
Code compliance
Philippine Electrical Code, Plumbing Code, Fire Code (RA 9514) and Mechanical Code — designed in, not patched on.
Fit-outs & renovations
Restaurants, offices, retail and commercial spaces — where kitchen exhaust, power and fire protection make or break the schedule.
Built for buildings that can't afford downtime
Commercial fit-outs
Restaurants, offices and retail — kitchen exhaust, dedicated power, sprinklers and grease drainage coordinated so the space passes inspection and opens on schedule.
Facilities on PMS contracts
Scheduled servicing of aircon, ventilation, pumps and fire systems — logged, on a calendar, before breakdowns happen during business hours.
Renovations of existing buildings
Pair the as-built MEPFS assessment with a structural assessment and renovate knowing what's behind the walls and above the ceiling.
Frequently asked
Fitting out, renovating, or tired of breakdowns?
Send the building type, floor area and which systems you need — we reply with a fixed quotation, usually within 2-3 business days.