Open ceiling in a commercial fit-out with ductwork, fire sprinkler piping and electrical containment
Electricians testing a panel board against a printed load schedule
Technicians servicing a rooftop air-conditioning unit during a scheduled maintenance visit
Restaurants · Clinics · Offices · Retail

Open on the date you planned.
Stay open after.

Fit-outs, renovations and preventive maintenance for businesses in Negros Oriental, handled by licensed civil and electrical engineers. For commercial spaces elsewhere in the Philippines we do the complete design and oversee your contractor remotely.

Message us on Viber
Neg·Or
Build & maintain
PH·wide
Design & remote oversight
PEE
Signed electrical reports
Jan 20
Permit renewal deadline
The difference

What actually costs a business money

It is rarely the price of the fit-out. It is opening three weeks late, a kitchen closed for a clogged grease line on a Saturday, or a permit renewal held up by a finding nobody checked for.

Call someone when it breaks

Every problem arrives during trading hours

  • Trades hired separately, and no one owns the opening date
  • Panels and drains checked only after something fails
  • Permit-renewal findings discovered at the counter, in January
AEDO: one engineering team

Scheduled, documented, signed

  • One contract and one accountable team from design to turnover
  • Maintenance on a calendar, with a signed report after every electrical inspection
  • A readiness check before you file, so fixes happen on your schedule
How it works

From first visit to a building that stays compliant

1
Assessment
2
Quotation
3
Design & permits
4
Works
5
Maintain

1. Site visit & assessment

We look at the space before quoting anything: structure, electrical capacity, drainage and what the permit will need. For an operating business, this is where we find what must be fixed first.

Scope

Six ways to work with us

Commercial fit-out

Bare shell to opening day: design, structural works, electrical and plumbing, finishes and permit documents under one contract. Negros Oriental.

Renovation & repair

Operating spaces refreshed or repaired, assessment first, phased around trading hours. Negros Oriental.

Preventive maintenance

Panel thermal scans, torque and insulation tests, grease trap and drainage servicing, building-fabric checks, on an annual contract billed monthly. Negros Oriental.

Permit-season readiness check

One visit before your January renewal: exits, emergency lights, extinguishers and electrical panels, with a one-page fix list.

BP 344 accessibility audit

Ramps, toilets, parking and doors checked against the 2024 Revised IRR, with a costed fix list.

Design + remote oversight

Outside Negros Oriental: the complete design and permit set, then we oversee the contractor you hire.

Where this fits

Built for businesses that cannot close for repairs

Electricians testing a panel board with a multimeter

Restaurants & food service

Grease traps, kitchen drainage and heavily loaded panels are where restaurants fail. We put them on a schedule. Planning one? See the restaurant fit-out cost guide.

Technicians servicing a rooftop air-conditioning condenser

Clinics, offices & retail

Tenant fit-outs that pass the landlord's rules and the permit on the first submission. See tenant fit-out requirements and clinic fit-out costs.

Existing building under renovation with new block walls and scaffolding

Older commercial buildings

Start with a structural assessment and our MEPFS team's survey, then renovate knowing what is behind the walls. More on preventive maintenance.

Questions

Frequently asked

No. We design and build in Negros Oriental only: Dumaguete, Bais, Tanjay, Sibulan, Valencia and nearby towns. For commercial spaces elsewhere in the Philippines we prepare the complete design and permit set and oversee your contractor remotely, with progress reports, cost tracking and quality checks.
A PMS contract puts your electrical panels, grease traps and drainage, aircon and building fabric on a fixed inspection and servicing schedule instead of waiting for something to fail during business hours. It is billed monthly on an annual contract, and each electrical inspection comes with a report signed by a licensed electrical engineer.
Business permits are renewed by 20 January and need a current Fire Safety Inspection Certificate. Before you file, a licensed engineer walks your building and checks the items inspectors look at: exits and egress, exit signs and emergency lights, extinguishers, electrical panels and visible wiring faults. You get a one-page list of what to fix. We do not issue the FSIC; the Bureau of Fire Protection does.
Yes. We audit ramps, landings, handrails, accessible toilets, parking, doors and signage against the 2024 Revised IRR of BP 344 and give you a fix list with costs, so the correction work can be scoped and priced.
Yes. Many businesses prefer to buy materials on their own account. We supply the engineering, supervision and crew, and the materials stay on your books.
Per space and scope. Send the business type, floor area, location and what you need, whether a new fit-out, a renovation, a maintenance contract or a readiness check, and we reply with a fixed quotation, usually within 2-3 business days.

Opening, renovating, or renewing your permit in January?

Send the business type, floor area and location, and we reply with a fixed quotation, usually within 2-3 business days.

Open ceiling in a commercial fit-out with ductwork and fire sprinkler piping

One team, one quotation.

Tell us the business, the space and what you need, and we'll scope it as one package.

One Accountable TeamDesign, installation, and maintenance under one roof.
Licensed EngineersSigned reports from a licensed civil and electrical engineer.
Replies Within 24 HoursA real engineer reviews every message.

Tell us about your project

or leave your details

We'll review and reply by email — usually within 24 hours.