House Construction Materials List Philippines — Phase-by-Phase Checklist

🏗️
AEDO Engineering
AEDO Engineering's team of PRC-licensed civil engineers provides Bill of Quantities, structural design, and design-build construction services nationwide from a base in Negros Oriental.
🏗️15+ Projects Completed
📅Est. 2021 — 5+ Years
👷PRC-Licensed Engineers
🗺️7 Provinces Served

Want exact quantities for your actual floor plan, not a generic checklist?

✓ Itemized BOQ ✓ From ₱3,000 ✓ 3–5 Day Turnaround
Get My BOQ

Every material on a house build falls into one of 6 phases, and knowing what's coming before it's needed is the difference between a smooth site and a work stoppage waiting on a supply run. This is the complete checklist — organized the way construction actually happens, foundation through turnover — with the quantities and prices we can verify, and honest pointers to get exact numbers for everything else.

Materials Snapshot — Verified Quantities

13 CHB blocks per m² of wall (incl. 5% waste)
₱270 Per 40kg bag of Portland cement (2026)
0.5 Cement bags per m² of 100mm CHB wall (mortar)
₱37-45 Per kg — current spot rebar price range (2026)

These figures come from AEDO's own CHB Quantity Estimator and PSA-tracked material price index — everything else in this checklist is a completeness list, not a priced quantity, since roofing, MEP, and finish-stage quantities depend heavily on your specific floor plan and finish level.

🧮

Want the CHB, Cement, Sand & Rebar Numbers for Your Actual Wall Area?

Enter your wall dimensions into the free CHB estimator and get an instant, itemized quantity and cost breakdown.

Use the Free CHB Estimator

The Complete List, Phase by Phase

This follows the same 6-phase sequence covered in our real project walkthrough — materials arrive roughly in this order, not all at once.

1

Foundation & Structure

  • Portland cement (40kg bags) — ₱270/bag, 2026
  • Reinforcing steel bars (10mm, 12mm, 16mm)
  • Tie wire (#16 GI wire)
  • Coarse aggregate (gravel, 3/4")
  • Fine aggregate (washed sand)
  • Formwork lumber (coco lumber or plywood)
  • Form ties, nails, and bracing
  • Concrete hollow blocks (footing/wall foundation, if used)
  • Waterproofing membrane (footing/basement, if applicable)
  • Anchor bolts and column dowels
Sizing this phase: footing size depends on your column loads and soil bearing capacity — see our free NSCP footing size calculator before ordering concrete and rebar quantities.
2

Masonry & Enclosure

  • CHB (100mm or 150mm) — 13 pcs/m² incl. waste
  • Portland cement for mortar — ~0.5 bags/m² (100mm)
  • Fine sand for mortar and plaster
  • Masonry rebar (typically 10mm @ 600mm v / 400mm h, per NSCP 2015 Chapter 7 masonry reinforcement provisions)
  • Lintel beam rebar and formwork
  • Door and window frames (jambs)
  • Scaffolding (rented or owned)
  • Mortar mixing tools/mixer rental
Exact quantities: our CHB Quantity Estimator computes blocks, cement, sand, and rebar for your specific wall length and height in seconds.
3

MEP Rough-In (Electrical, Plumbing)

  • PVC/PPR water supply pipes (1/2", 3/4")
  • PVC drainage/sewer pipes (75mm, 100mm)
  • Fittings — elbows, tees, couplings, unions
  • Septic tank (precast or poured concrete)
  • Electrical wire (THHN, 2.0mm² and 3.5mm²)
  • PVC electrical conduit and junction boxes
  • Panel board / breaker box + circuit breakers
  • Outlet and switch plates (rough-in boxes)
  • Ground rod and grounding wire
Sizing the septic system: use our NPC septic tank & absorption field calculator to size the tank and field correctly before pouring.
4

Roofing

  • Steel roof trusses (fabricated or C-purlin)
  • Purlins
  • Roofing sheets (long-span, corrugated, or tile-profile)
  • Roofing screws/rivets and washers
  • Ridge roll and flashing
  • Gutters and downspouts
  • Insulation (radiant barrier or foam board, optional)
  • Fascia board
5

Finishes

  • Cement plaster/skim coat (walls and ceiling)
  • Floor tiles and wall tiles
  • Tile adhesive and grout
  • Ceiling board (gypsum or fiber cement) and metal furring
  • Interior/exterior paint (primer + topcoat)
  • Interior doors
  • Windows (awning, sliding, or casement — glass + frame)
  • Baseboards / cornice moulding (optional)
6

Fixtures & Turnover

  • Toilet, lavatory, and faucets
  • Kitchen sink and faucet
  • Shower set / water heater (if applicable)
  • Light fixtures
  • Door hardware (hinges, locksets)
  • Window screens and grilles
  • Cabinet hardware (kitchen/closet, if built-in)
  • Final touch-up paint and cleaning supplies

6 Buying Tips That Save Real Money

Common Mistake

Estimating wall materials from total floor area instead of actual wall length × height. This over-estimates material by 15-25% on a typical 3-bedroom house with doors and windows — you end up paying for roughly 60 extra blocks per room. Always deduct door and window openings before ordering.

Why a Generic List Isn't Enough to Order From

This checklist tells you what to budget for at each phase — it deliberately doesn't give you exact quantities for roofing, MEP, or finishes, because those genuinely depend on your floor area, roof design, number of fixtures, and finish tier. Ordering from a generic number instead of your actual plan is how projects end up with expensive shortages mid-pour or wasteful overstock sitting unused. A proper Bill of Quantities, computed from your floor plan, is what an order should actually be based on.

For Homeowners & Developers Anywhere in the Philippines

Get an Itemized Bill of Quantities From Your Actual Floor Plan

Stop estimating from a generic checklist — AEDO's engineers compute exact material quantities and costs from your specific plan, delivered in 3-5 days.

Bill of Quantities, Structural Design & Design-Build — One Team

AEDO Construction computes exact material quantities from your floor plan, designs the structure to NSCP 2015, and — in Negros Oriental — builds it. One licensed engineer, start to finish.

  • Itemized Bill of Quantities — from ₱3,000, 3-5 day turnaround
  • Full structural design (footings, columns, beams, slabs)
  • Sanitary/plumbing design including septic sizing
  • Material cost estimate matched to current supplier pricing
  • Design-build execution from groundbreaking through turnover (Negros Oriental)

Checklist for Planning, BOQ for Ordering

Use this list to budget and sequence your purchases by phase — then get an itemized BOQ from your actual floor plan before you place real orders. The gap between "roughly right" and "exact" is where most site budgets quietly go over.

Materials List Bill of Quantities House Construction CHB Construction Checklist
Get My BOQ →

Frequently Asked Questions

Materials across 6 phases: foundation/structure (cement, rebar, gravel, sand, formwork), masonry (CHB, cement, sand), MEP rough-in (pipes, wire, conduit, panel board), roofing (trusses, purlins, sheets, gutters), finishes (tiles, paint, ceiling board, doors, windows), and fixtures (plumbing fixtures, lighting, hardware). Exact quantities depend on floor area, storeys, and finish level.

About 13 blocks per m² of wall area (incl. 5% waste), plus roughly 0.5 bags of 40kg cement per m² of 100mm CHB wall for mortar (about 0.65 bags/m² for 150mm). A 3-bedroom house with ~150-180 sqm of wall area typically needs 2,000-2,400 blocks and 75-90 bags of cement for masonry alone.

Per phase is safer for most homeowners — it protects cash flow and reduces theft/damage risk from prolonged site storage. The exception is materials with price volatility or long lead times, like rebar and roofing sheets, which some contractors recommend locking in early.

A generic checklist tells you what to budget for; it doesn't replace an actual Bill of Quantities computed from your floor plan. AEDO Construction provides a BOQ and itemized cost estimate from ₱3,000, delivered in 3-5 days.

Notes CHB block count (13/m²), cement mortar ratio (0.5 bags/m² for 100mm CHB), and current cement price (₱270/40kg bag) are drawn from AEDO's own CHB Quantity Estimator. Rebar spot price range and phase sequencing are drawn from AEDO's PSA-tracked material price index post and house construction stages walkthrough, respectively. This is a general planning checklist, not a substitute for an itemized Bill of Quantities computed from a specific floor plan.