AEDO Play / For teachers

Classroom pack

AEDO Play is a set of short browser games about how structures carry load and how Philippine building codes set the numbers. This page is for teachers who want to use them in class: what each game teaches, three lesson plans you can run in 40 to 60 minutes, discussion questions with answer notes, and a worksheet to print.

  • No login and no account. Students open the link and play.
  • Works on phones, tablets and laptops in an ordinary browser.
  • Progress (stars, unlocked missions, XP) is saved in the browser on that device only. You cannot see students' scores, so collect results with the worksheet.
  • On shared lab computers, the last student's progress stays in that browser for the next one.
01 / THE GAMES

What each game teaches

Five activities, from a three-minute warm-up to a full build-and-test session. Teacher notes under each game describe what a good student answer sounds like.

Build It

Bridges / gravity load / 6 missions / 20 to 30 min for Missions 1 to 3

Students join dots on a grid to build a bridge truss, then run a truck across it. Every edit triggers a live stability check: the status line says when road points are still unconnected, when the shape can still fold (and circles the joints that need a diagonal), or when every joint is locked. The check covers stability only. Whether a member is strong enough is found out by running the truck test.

During the test, members are coloured by how hard they work: light, working, near the limit, gave way. If a member breaks, the game freezes at that moment, names the member and says whether it was squeezed (compression) or stretched (tension).

Concepts in plain terms

  • Triangles are stable. Pin-jointed bars only hold their shape when they form triangles. A square panel folds like a hinge.
  • Longer spans are disproportionately harder. Forces grow faster than the span does.
  • Compression and tension. In the truss, one chord is squeezed and the other is stretched, which is how a truss does the job of a solid beam.
  • Put strength where the force is. Steel is about 3.5 to 4.5 times stronger than timber in the game but nearly 4 times the cost per metre.
  • Cables work only in tension. A cable that gets pushed goes slack and carries nothing.

Missions

MissionConceptSpanLoadBudgetMaterials
1 First CrossingLoad and support6 m400 kg₱22,000Timber
2 Going the DistanceSpan10 m500 kg₱34,000Timber
3 The Breaking PointBending behaviour14 m650 kg₱48,000Timber, steel
4 Steel YourselfMaterial strength16 m950 kg₱120,000Timber, steel
5 Hang in ThereTension vs compression18 m1,000 kg₱145,000Timber, steel, cable
6 Do More With LessOptimisation20 m1,200 kg₱175,000Timber, steel, cable

Suggested: Missions 1 to 3 for a first lesson; 4 and 5 for a follow-up on materials; 6 as an extension or homework. Missions unlock in order, one after each pass.

Discussion questions

  1. Your first bridge may have folded even though every road point was connected. Why?
  2. Which members were squeezed and which were stretched? How could you tell?
  3. Mission 2 is only 4 m longer than Mission 1. Did your bridge need to be only a little stronger?
  4. In Mission 4, why not build the whole bridge in steel?
  5. In Mission 5, where is it safe to use a cable, and where is it not?

Open Build It

Engineer vs Nature

Wind storms and quake storms / 25 to 35 min

Same build-and-test idea and the same materials as Build It, but the load pushes sideways. In the wind storms the force ramps up from zero to full strength, blowing from left to right. Storms 1 to 6 use the bridge-style grid; Storms 7 to 9 stand the frame up as a multi-storey building on a fixed base. The quake storms shake the structure instead of pushing it one way.

Concepts in plain terms

  • Lateral load. Wind pushes sideways, not down. A frame that holds its own weight can still rack sideways without diagonal bracing.
  • Base shear. All the sideways force has to leave through the supports, so members near the base work hardest.
  • Reserve capacity. Passing at 95% of capacity leaves almost nothing for a stronger gust. That margin is what a factor of safety is for.
  • Storeys add up. The ground floor carries the wind on every floor above it.
  • Soft storey. One unbraced floor, often an open ground floor for parking or shops, can undermine the whole building.
  • Shaking reverses. An earthquake pushes both ways, a heavier structure attracts more seismic force, and cables (tension only) must be used as crossed X-brace pairs so one is always pulled.

Storms

StormConceptStructureWindBudgetMaterials
1 First GustLateral bracing6 m span15 kN₱22,000Timber
2 Strong BreezeBase shear10 m span25 kN₱34,000Timber
3 Gale ForceWorking near the limit14 m span33 kN₱46,000Timber, steel
4 Storm SignalMaterial strength16 m span42 kN₱80,000Timber, steel
5 Typhoon Signal 4Tension-only bracing18 m span70 kN₱135,000Timber, steel, cable
6 Super TyphoonOptimisation20 m span95 kN₱155,000Timber, steel, cable
7 First FrameBuilding frames3 storeys14 kN₱52,000Timber
8 The Walk-UpStorey height4 storeys16 kN₱82,000Timber, steel
9 The Soft StoreySoft-storey risk4 storeys, 3 bays45 kN₱155,000Timber, steel, cable

Quake storms: First Tremor (shaking reverses both ways), Heavy Roof (a heavier structure attracts more seismic force) and The Big One (cables are tension-only, so brace with crossed cable pairs).

Suggested: Storms 1 and 2 for wind (Storm 7 if students have reached it), then the quake storms. Wind storms unlock one after another. The quake storms are a separate track: Quake 1 opens as soon as Storm 1 is passed, and each quake opens the next. The quake levels are two-storey frames, so they fit in one lesson.

Discussion questions

  1. Wind pushes sideways, not down. Why does the same triangle pattern from Build It still work?
  2. Which members worked hardest in Storm 2, and why there?
  3. Gale Force lets you pass at 95% of capacity. Would you build that for real?
  4. In The Walk-Up, why was steel needed only on the ground floor?
  5. Wind in the game blows one way. What changed when the ground shook back and forth, and why did a heavier roof make it harder?

Open Engineer vs Nature

Blueprint Detective

Philippine codes / 22 cases / about 10 min per file

Each case shows a drawing and four labelled dimensions. Exactly one of the four breaks a Philippine code; students tap it. The game then highlights the problem on the drawing and shows the code section with a short explanation. A file is 10 cases drawn in turn from all four codes, in random order, so neighbours will not see the same sequence. Each case is worth 100 points; each of the two hints costs 25, and a streak of correct answers adds a bonus. The end screen lists the score per code and the citation for every miss.

Concepts in plain terms

  • Codes set numbers for a reason. Ramp slopes, stair risers, exit distances and concrete cover all protect someone.
  • Conditions matter. The same item can have different limits depending on lot class, sprinklers, extinguisher weight or the rise of a ramp.
  • Right number, wrong place. Several cases use a real figure from the wrong row or the wrong part of the building.
  • Old figures linger. Some numbers still repeated online come from rules that have since been revised.

The 22 cases (what fails and what the code asks for)

CaseWhat failsRequirement shown in the gameSection cited
BP 344 accessibility (2024 Revised IRR), 7 cases
The Steep Ramp1:12 slope, 900 mm rise1:20 maximum; 1:15 only if rise is 700 mm or less and ramp no longer than 10.50 mApp. A 1.2(b), Table A.1.1
The Short Landing1,200 mm top landingLevel area of at least 1,800 mm at top and bottomApp. A 1.2(e)
One Rail OnlySingle rail at 900 mmHandrails on both sides at 700 mm and 900 mmApp. A 1.2(f)
The Squeezed Walkway900 mm walkwayAt least 1,200 mm clear in front of PWD slotsApp. A 6.7(b)
The Ordinary Slot2,500 mm slot widthPWD slot at least 4,000 x 5,000 mmApp. A 6.7(a)
The Tight Cubicle1,500 x 1,500 mm cubicleAt least 1,800 x 1,800 mmC.6.3(a)
The Wrong-Way DoorDoor swings inwardToilet doors open outwardC.6.14
PD 1096 National Building Code (2004 Revised IRR), 6 cases
The Forward House3.00 m front yard on R-1R-1 front setback at least 4.50 mRule VIII, Table VIII.2
The Boundary Wall0 m side with firewall on R-1No abutment on any property line of an R-1 lotRule VIII, Sec. 803 item 4.c
The Small Window0.80 m² window, 12 m² roomAt least 10% of floor area and not under 1.00 m²Rule VIII, Sec. 808
The Low Ceiling2.40 m, natural ventilationAt least 2.70 m without artificial ventilationRule VIII, Sec. 805
The Tall Steps220 mm riser200 mm maximum (Fire Code IRR: 180 mm for houses)PD 1096 Sec. 1207(e)(2)
Mind Your Head1.80 m stair headroomAt least 2.00 mPD 1096 Sec. 1207(e)(12)
RA 9514 Fire Code (2019 Revised IRR), 5 cases
The Narrow Exit Stair900 mm stair for 120 peopleAt least 1,120 mm (915 mm only under 50 people)Sec. 10.2.5.4, Table 4
The Dead End10 m dead end, no sprinklers6 m maximum (15 m in a sprinklered business occupancy)Sec. 10.2.5.2 (I), 10.2.16.2
The Far Exit55 m travel, no sprinklers46 m maximum (61 m with supervised sprinklers)Sec. 10.2.16.2 (F)
Out of ReachTop of 4.5 kg unit at 1.80 mTop no higher than 1.5 m for units up to 18 kgSec. 10.2.6.9 (E.9)
The Long Walk18 m walk to extinguisher12 m maximum in a moderate hazard dining areaSec. 10.2.6.9 (G), Table 7
NSCP 2015 structural code, 4 cases
Thin Cover40 mm footing bottom cover75 mm for concrete cast against soilTable 420.6.1.3.1
The 8 by 8 Column200 x 200 mm column, Zone 4Special moment frame columns at least 300 mm on the short sideSec. 418.7.2.1
Light on Steel4 bars of 12 mm (0.50%)Main bars at least 1% of the gross column areaSec. 410.6.1.1, 418.7.4.1
Wire-Thin Ties6 mm tiesAt least 10 mm ties for main bars up to 32 mmSec. 425.7.2.2

Discussion questions

  1. Pick one violation you caught. Who could get hurt or stuck if it were built that way?
  2. The Short Landing, The Ordinary Slot and The Forward House all use a real number in the wrong place. How do mix-ups like that happen?
  3. Why would the Fire Code allow a longer dead-end corridor or travel distance when a floor has sprinklers?
  4. Some old figures (a 1:12 ramp, a single 900 mm rail) still circulate online. How would you check which rule is current?

Open Blueprint Detective

Load Path Detective

Real structures / 8 rounds and 4 case files / about 3 min per round

Each round shows a real photograph with lettered markers on its main parts. Students tap the parts in the order a gravity load travels, from where it lands down to the ground. Where the load splits (cables to towers and anchorages, slabs to wings and core), either order counts. They then say whether key members are squeezed (compression) or stretched (tension). Some markers are deliberate traps, such as the Eiffel Tower's decorative arches or the granite pylons of Sydney Harbour Bridge. Wrong taps and traps cost 10 points each; correct force answers add 10.

The four case files (Hyatt Regency walkways 1981, Tacoma Narrows 1940, Quebec Bridge 1907, Ronan Point 1968) have no score. Students find where the load path broke, then read what the investigation found, the lives lost, and what changed in practice. Each round lists its sources and the photo credit.

Concepts in plain terms

  • Every load needs a path to the ground. Floors, decks and roofs pass weight to members, members to supports, supports to foundations.
  • Cables and hangers only pull; arches and columns mostly push. Knowing which is which explains a structure's shape.
  • Not everything you see is structural. Some parts are there for looks or comfort, not to carry the weight.
  • One weak link is enough. A single connection, chord or wall panel can bring the rest down if there is no other path.

Discussion questions

  1. Golden Gate and Sydney Harbour Bridge both carry a road over water. How does the weight reach the ground differently in each?
  2. Why do you think the Eiffel Tower's arches and Sydney's pylons were built if they carry no load?
  3. At the Hyatt Regency a small change in the shop drawings doubled the load on one connection. Who should have caught it, and how?
  4. Ronan Point lost one wall panel and a whole corner fell. What does "an alternative load path" mean?

Open Load Path Detective

Daily drill

Warm-up / about 3 to 5 min / new set every day

Three short steps on the Play home page: a Term of the Day card (tap to flip for the definition and why it matters), a five-question quiz with an explanation after each answer, and five Myth or Fact claims. The set is picked from the calendar date, so everyone who opens it on the same day gets the same term, questions and claims. It changes at midnight.

The pools cover 26 terms (truss, cantilever, base isolation, slump test, punching shear and others), 22 quiz questions and 16 myth claims, mixing structural ideas, concrete practice, permits and codes.

Discussion questions

  1. Which question did most of the class miss? Read its explanation aloud and restate it in your own words.
  2. Today's term: where could you see it in a building near the school?
  3. Which myth surprised you, and where had you heard it before?

Open the daily drill

02 / LESSON PLANS

Three ready lessons

Each runs about 50 minutes and can be cut to 40 by shortening the discussion. Pairs work well: one builds, one records on the worksheet, then they swap.

Why triangles

Build It, Missions 1 to 3 / 50 min / worksheet Part A

Goal: students can explain why a truss uses triangles and which members are in tension and compression.

  1. 0 to 5Hook. Show a square and a triangle made of four and three strips (cardboard and paper fasteners, or rulers held at the corners). Push the corner of each. Ask why one leans and one does not.
  2. 5 to 10Demo Mission 1 on the projector. Show the dashed starter shape, the status line, and the truck test colours.
  3. 10 to 30Pairs play Missions 1, 2 and 3. After every test, record cost, stars, and which member failed and whether it was squeezed or stretched.
  4. 30 to 45Discussion with Build It questions 1 to 3. Put the cheapest passing cost for each mission on the board.
  5. 45 to 50Exit ticket: worksheet Part D, question 1.

Extension: Mission 4 for pairs who finish early, to set up the next lesson on choosing materials.

Wind vs earthquake

Engineer vs Nature / 50 to 60 min / worksheet Part B

Goal: students can describe how wind and earthquake loads differ and why bracing, ground floors and cable pairs matter.

  1. 0 to 5Ask: a typhoon and an earthquake both push a house sideways. What is different about them?
  2. 5 to 20Storms 1 and 2. Students note that the members near the supports work hardest.
  3. 20 to 30Storm 7, First Frame: the same idea standing up as a building. Every storey needs its own bracing.
  4. 30 to 45Quake storms: First Tremor, Heavy Roof and The Big One. Students record what changed compared with wind.
  5. 45 to 55Discussion with Engineer vs Nature questions 2, 3 and 5. Close by asking why the open ground floor in Storm 9 is risky in an earthquake.

Before class: students need Storm 1 passed before Quake 1 opens. That takes about five minutes, so it can open the lesson. Storm 7 opens only after Storms 1 to 6, so set those as homework if you want the building frame in class.

Read the code

Blueprint Detective / 45 to 50 min / worksheet Part C

Goal: students can read a dimensioned drawing, find the value that fails, and explain the requirement in their own words.

  1. 0 to 5Introduce the four codes: BP 344 (accessibility), PD 1096 (National Building Code), RA 9514 (Fire Code) and NSCP 2015 (structural). Who does each one protect?
  2. 5 to 20Each student plays one file of 10 cases alone and records every case on the worksheet.
  3. 20 to 32Pairs choose two cases either of them missed, read the citation, and explain the rule to each other.
  4. 32 to 45Discussion with Blueprint Detective questions 1 to 3.
  5. 45 to 50Homework: measure the riser height of one stair at school and compare it with the 200 mm limit from The Tall Steps. Report in millimetres.
03 / MORE WAYS TO USE IT

Short activities and class challenges

Daily Bridge

A Build It mode with one puzzle per day, the same for everyone, with a shareable result. Have the whole class solve the same day's bridge, then list costs on the board and look at how the cheapest one differs from the rest.

Sandbox mode

A Build It mode where students choose the span, height and truck load, with all three materials and no budget. Good for open questions: what happens to cost when the span doubles but the load stays the same?

Challenge a friend

After a pass, Build It can make a link that carries the bridge's cost and stars. The friend who opens it is asked to cross the same mission for less. Post one link in your class stream and see who beats it.

Bell-ringer

Open the daily drill at the start of class for three to five minutes. Same questions for everyone that day, so answers can be checked together.

04 / STUDENT WORKSHEET

Printable worksheet

Choose the parts you need, then print. The page prints only the worksheet, without the menu or teacher notes.

Include:

AEDO Play worksheet

Build, test, and explain what happened. Write in full sentences where asked.

aedoconstruction.com/play
Name
Section
Date

Part A. Build It

Play Missions 1 to 3 (or the missions your teacher sets). After each passing test, fill one row. If a test fails, write which member gave way and whether it was squeezed (compression) or stretched (tension).

MissionCost (₱)StarsFailed testsMember that failed firstSqueezed or stretched? Why?
1
2
3

Part B. Engineer vs Nature

Record each storm or quake storm you play. Note where the structure failed first: near the supports, mid-span, ground floor or upper floor.

Storm (number and name)Cost (₱)StarsWhere it failed firstWhat you changed to pass

Part C. Blueprint Detective

Play one file of 10 cases. For each case, write the code, the value that failed, and what the code asks for.

#Case titleCodeValue that failedWhat the code asks forRight?
1
2
3
4
5
6
7
8
9
10

Part D. Reflection

1. Why do bridges and roof frames use triangles instead of squares?
2. Name one member that was squeezed and one that was stretched in your bridge. How did you know?
3. How is an earthquake load different from a wind load on the same building?
4. Choose one code rule from Part C. Who does it protect, and how?

AEDO Play games use simplified physics to build intuition. They are not design tools. Codes cited: BP 344 (2024 Revised IRR), PD 1096, RA 9514 (2019 Revised IRR), NSCP 2015.

05 / SCOPE AND SOURCES

What the games are, and are not

The games use simplified, game-scale physics for intuition. Build It and Engineer vs Nature solve a real pin-jointed truss, but the materials, capacities and costs are internally consistent game values, not real design figures. They are not design tools, and a passing structure in the game says nothing about a real one.

Blueprint Detective cites Philippine codes: BP 344 (2024 Revised IRR), PD 1096 National Building Code (2004 Revised IRR), RA 9514 Fire Code (2019 Revised IRR) and NSCP 2015. Cases are cut down for a quick read and drawings are not to scale. Codes are revised over time, so check the current official text before using a figure outside the classroom.

This pack fits physics and engineering-intro classes in general. It is not mapped to specific DepEd or CHED curriculum codes or competencies.

The site uses Google Analytics and Microsoft Clarity for usage statistics, as on the rest of aedoconstruction.com. Students do not create accounts or enter names in the games.

Questions about a real building?

The games build intuition. For an actual project, a licensed engineer can give an answer specific to the site.